OPTIKON - Computer Vision
HomeCase StudiesPublicationsFAP CalculatorNewOLIE GameNew
FLEETS, CYCLES & MOBILE CUBING // FLEET & EQUIPMENT

Haulage Cycle Optimization, Scale-Free Dump Truck Cubing, and Autonomous Mobile Infrastructure for Remote Work Fronts

Scale-free moving truckload volume cubing, heavy earthmoving equipment telemetry, solar poles, and the OLIE OPTIKON autonomous mobile tower.

Scale-free moving truck cubingUnderload & overload detectionAutonomous mobile tower on wheels
Heavy haul trucks and machinery monitored via Optikon computer vision
HEAVY FLEET INEFFICIENCIES

How underloaded truck beds and blind haul cycles inflate diesel costs

Trucks hauling partial payloads waste fuel and cycle times, while severe overloading damages axles and unpaved haul roads on remote, dynamic jobsites.

01

Haul trucks running underloaded (empty air freight)

Trucks traveling at 70% or 80% volume capacity severely inflate fuel costs and degrade fleet cycle efficiency.

Optimized in motion by OPTIKON
02

Severe truck overload damaging tires and haul roads

Overfilled beds blow out expensive tires, damage suspensions, heighten rollover risk, and degrade unpaved haul roads.

Optimized in motion by OPTIKON
03

Lack of grid power and network on dynamic fronts

Earthmoving and dam construction fronts move constantly, making trenching electrical or fiber cables completely unfeasible.

Optimized in motion by OPTIKON
FLEET & CUBING MODULES

Optical Dump Truck Cubing & Cycle Telemetry

In-motion truck bed volumetric cubing without ground scales, unified with machinery productivity heatmaps.

DYNAMIC CUBING

Module A: Volumetric Measurement in Dump Trucks

Automated 3D optical gantry measuring bed volume in motion without requiring trucks to halt on a weighbridge.

  • Automated volume tracking across off-highway and highway dump truck beds.
  • Instant detection of empty beds, uneven heaps, underloads, and dangerous overloads.
  • Dashboard detailing total haul trips, fleet capacity utilization (e.g. 74%), cubic meters (m³), and estimated tonnage.
  • Cross-sectional bed profile displaying peak and mean load height in meters.
Module A: Volumetric Measurement in Dump Trucks
0 Scales
Moving volume cubing without weighbridges
View pilot
HAUL CYCLE TELEMETRY

Module B: Haulage Fleet Telemetry & Cycle Times

Automated haul cycle timing from loading shovels to dump points, eliminating manual driver log sheets.

  • Haul route monitoring and round-trip cycle time calculation between excavators and disposal areas.
  • Tracking of effective hauling time vs waiting in queue or inefficient maneuvering.
  • 100% digital paperless verification replacing driver logbooks with auditable data.
100% Digital
Zero manual operator paper logs
View pilot
OPERATIONAL HEATMAPS

Module C: Equipment Productivity & Jobsite Heatmaps

Spatial heatmaps evaluating heavy machinery utilization rates across active work areas.

  • Periodic productivity summaries for wheel loaders, motor graders, and vibratory rollers.
  • Visual heatmaps highlighting equipment bottlenecks or under-utilized machinery.
  • Cut-and-fill front balancing to align excavator output with truck haulage capacity.
Module C: Equipment Productivity & Jobsite Heatmaps
Heatmaps
Visual spatial density across site fronts
View pilot
LOAD TELEMETRY & HAULAGE AUDIT

Truck Bed Volumetric Profile and Trip Accounting

Console presenting loaded vs empty trip timelines, mean load height, and volume utilization index per vehicle.

184 trips
Monitored Haul Trips
Across evaluated operational shift
74.2%
Mean Bed Utilization
Fleet balancing target: 88.0%
3,680 m³
Total Volume Hauled
Equivalent to ~5,888 transported tons
28 trips
Underloaded Trips
Immediate fleet optimization opportunity
OPTIKON TELEMETRY · LIVE FEED
SECURE STREAM // AES-256
Cubagem volumétrica óptica de caminhões basculantes e veículos pesados
8x4 dump truck bed filled to ideal volumetric capacity with no side spillage
16:15:22 · CUBING GANTRY 01 · Precisão: 99.2%
Conforme

3D bed point clouds and cross-sectional slices archived for every single haul trip across the jobsite.

Photographic Crops (Audit)3 eventos
Continuous Audit StandardExportable PDF/Excel reports with full traceability per sector, work front, or operational shift.
AUTONOMOUS FIELD INFRASTRUCTURE

Solar Poles & OLIE Autonomous Mobile Tower

Field-hardened autonomous solar and satellite structures engineered for dynamic earthmoving fronts nationwide.

STRUCTURE ON WHEELSHARDWARE // INDUSTRIAL GRADE

OLIE OPTIKON · Autonomous Mobile Unit

Solar power, satellite connectivity, and edge AI on a mobile wheeled chassis

Towable mobile tower on wheels designed to accompany dynamic earthmoving and tailings dam fronts without requiring cranes or permanent fixtures.

OLIE OPTIKON · Autonomous Mobile Unit
Power SupplySolar PV + Deep-Cycle Battery
ConnectivityStarlink / 4G / 5G
CamerasPTZ 360° + Night Vision
MobilityStandard vehicle tow hitch
  • Relocated across active fronts in under 15 minutes as work progresses
  • Continuous 24/7 solar autonomy even through prolonged overcast periods
  • Onboard edge AI processor executing real-time object and safety detection
Brazilian nationwide supportCheck availability →
PERMANENT SITE INFRASTRUCTUREHARDWARE // INDUSTRIAL GRADE

Optikon Autonomous Solar Poles

Over 20 autonomous poles deployed across major infrastructure projects in Brazil

Heavy-duty solar poles with integrated photovoltaic arrays, deep-cycle batteries, and Starlink terminals to cover expansive perimeters without grid power.

Optikon Autonomous Solar Poles
Field Deployed+20 Poles in Operation in Brazil
Battery AutonomyUp to 72h without sunlight
NetworkIntegrated Starlink terminal
Mast Height6 to 12 meters
  • Covers tailings dams, remote haul roads, and isolated storage yards
  • Zero underground trenching or electrical transformers needed
  • Weatherproof and vandal-resistant steel cabinet housing
Brazilian nationwide supportCheck availability →
INTERACTIVE 3D MODEL

Explore the OLIE Mobile Tower in 3D

Rotate, zoom, and inspect the towable autonomous chassis equipped with solar arrays, telescopic mast, and smart PTZ cameras.

LOADING 3D MOBILE TOWER...
DRAG TO ROTATE IN 3D
EARTHMOVING & INFRASTRUCTURE CASE
TAILINGS DAM & HIGHWAY DUPLICATION EARTHWORKS

18% Fleet Fuel Savings via Truck Bed Load Balancing and the OLIE Tower

Heavy earthworks project featuring 42 dump trucks and 8 hydraulic excavators operating in a remote area without cellular signal.

+17 p.p.
Bed Capacity Fill Gain
Surging from 72% up to 89%
-18%
Fuel Consumption
Per net cubic meter hauled
+20
Solar Poles in Brazil
Proven heavy field infrastructure

Operational Challenge

30% of haul trucks operated significantly under capacity, leading to excessive fuel consumption and daily disputes with subcontractors over billed earth volumes.

Implemented Solution

Deployment of the OLIE OPTIKON mobile tower equipped with an optical cubing gantry along the primary haul road and 4 solar poles at the disposal area.

Field-Verified Results

  • Fleet average bed utilization increased from 72% up to 89%.
  • 18% drop in fleet diesel fuel burn per transported cubic meter.
  • Eliminated contractual earthmoving measurement disputes via indisputable 3D audit logs.
  • Live streaming and telemetry access from anywhere via integrated Starlink satellite feed.
18% Fleet Fuel Savings via Truck Bed Load Balancing and the OLIE Tower
High-resolution auditable field capture
Contractual Validation

All compliance and progress metrics were directly piped into monthly owner billing and progress acceptance logs.

Deploy in your project
FAQ // CUBAGEM DE CAMINHÕES & OLIE

Frequently Asked Fleet & Equipment Questions

Does the truck need to stop for the bed to be cubed?

No. High-speed cameras capture and compute the bed volume cloud while the vehicle drives through the gantry at speeds up to 20 km/h.

How long does it take to relocate the OLIE mobile tower?

Under 15 minutes. The OLIE tower connects to standard vehicle hitches and can be towed by any utility pickup on site.

What happens during prolonged cloudy or rainy weather?

Both Optikon solar poles and the OLIE tower feature battery reserves engineered to provide up to 72 hours of continuous operation with zero sunlight.

TECHNICAL PILOT & DEMO

Schedule a complimentary operational assessment

Connect our engineering team to your operations. We assess camera viability, AI parameters, and deployment scenarios for Fleet & Equipment Management.

Leverage existing CCTV with zero ground infrastructure changes
Strict LGPD privacy compliance and industrial safety norms
Eligible for Lei do Bem R&D tax incentives (100% Brazilian tech)

Request Proposal & Technical Pilot

Fill in your company details to receive a technical response within 2 business hours.